Verosion | = | Runoff volume to be controlled for erosion (m3); | |
H2years | = | Rain level associated with a period of 24 hours and having a 2-year return period based on the rainfall intensity-duration-frequency values (mm); | |
0.75 | = | Rain level adjustment factor; | |
Atotal | = | Area of the installation or extension project of the storm water management system (ha); | |
Cr(p) | = | Weighted runoff coefficient; | |
10 | = | Conversion coefficient for the units. |
Verosion | = | Runoff volume to be controlled for erosion (m3); | |
H2years | = | Rain level associated with a period of 24 hours and having a 2-year return period based on the rainfall intensity-duration-frequency values (mm); | |
0.75 | = | Rain level adjustment factor; | |
Atotal | = | Area of the installation or extension project of the storm water management system (ha); | |
Cr(p) | = | Weighted runoff coefficient; | |
10 | = | Conversion coefficient for the units. |